Millions Approved for Will County Highway and Road Infrastructure Projects
Will County Board Meeting | April 16, 2026
Article Summary: The Will County Board authorized nearly $4.3 million in road improvement contracts, targeting key corridors including Francis Road, Renwick Road, and Laraway Road.
Infrastructure Key Points:
-
Austin Tyler Construction was awarded a $2,984,218.25 contract to rebuild and widen Francis Road.
-
P.T. Ferro Construction secured a $958,266.60 contract to resurface Renwick Road.
The Will County Board on Thursday, April 16, 2026, greenlit a slate of major infrastructure investments across the region, passing multiple resolutions on the consent agenda without opposition.
The largest expenditure was authorized by Resolution 26-113, which awarded a $2,984,218.25 contract to Austin Tyler Construction, Inc. The Elwood-based firm was the low bidder for a comprehensive project on Francis Road (County Highway 64) from Gougar Road to Wirt Road in County Board District 5. The scope of work includes roadway reconstruction and widening, storm sewer installation, drainage ditch improvements, culvert reconstruction, and retaining wall installation. The project is slated to begin in June 2026, during which the road will be closed to through traffic.
In Plainfield Township, the Board approved Resolution 26-114, confirming a $958,266.60 contract with Joliet-based P.T. Ferro Construction Co. The firm will resurface Renwick Road (CH 36) from east of U.S. Route 30 to west of Weber Road. The project, which also begins in June, will utilize Hot-Mix Asphalt (HMA) surface removal and replacement, centerline rumble strips, and deck slab repairs. The roadway will remain open during construction with periodic lane closures guided by flaggers. P.T. Ferro also secured a separate $194,014.90 contract (RES 26-115) to resurface various subdivision roadways within the Plainfield Road District.
The Board also took action on Laraway Road in New Lenox. Resolution 26-112 authorizes an agreement with LNS Development Group, LLC for stormwater management improvements along Laraway Road between Cedar Road and Spencer Road. The county will reimburse the developer an estimated $352,071.95 for the construction of a shared detention facility and storm sewer upgrades required for the county’s future plans to widen Laraway to a four-lane, barrier-median roadway.
Latest News Stories
U.S. Supreme Court to hear Michigan foreclosure case on Wednesday
DHS silent on number of agents remaining in Twin Cities
Supreme Court strikes down court error in baby food case
Illegal border crosser apprehensions drop 96% at southwest border in a year
Group says Congress must stop U.S. strikes on suspected drug boats
Supreme Court halts mail delivery lawsuit
Illinois quick hits: Chicago man faces charges in road-rage shooting; migrant accused of murdering church volunteer; Illinois Liquor Control Commission launches new system
Executive Committee Advances “Project Northwinds”: 2,475 Jobs and $346 Million Investment Proposed for Former Caterpillar, Lion Electric Sites
Monee Township Details December General Assistance Spending and Holiday Pantry Impact
Land Use Committee Advances Mokena Scrap Yard and Homer Glen Landscape Business Over Local Objections
Peotone Library Board Reviews HR Standards and Succession Planning
Village Honors Three Employees with Semi-Annual ‘CREW’ Awards