Board Establishes New Regulations and Fees for Wireless Telecommunication Facilities
Will County Board Meeting | April 16, 2026
Article Summary: In response to the state’s Small Wireless Facilities Deployment Act, the Will County Board passed Ordinance 26-134 to manage the collocation of small cell towers and wireless equipment within county rights-of-way.
Wireless Telecommunication Facilities Key Points:
-
Sets a $450 application fee for a single wireless facility on an existing structure.
-
Mandates an annual recurring rate of $200 per location for facilities placed on county-owned infrastructure.
-
Limits above-ground ancillary equipment volume to 25 cubic feet.
The Will County Board on Thursday, April 16, 2026, unanimously passed Ordinance 26-134, establishing Chapter 122 of the Business Regulations to oversee Wireless Telecommunication Facilities. The 20-0 vote formalizes the county’s permitting process and fee structure in alignment with the Illinois Small Wireless Facilities Deployment Act (50 ILCS 840).
The ordinance grants the Will County Division of Transportation the authority to regulate where and how telecommunication providers install new equipment, particularly “small cell” nodes used to boost cellular and Wi-Fi networks.
According to the approved text, companies must pay a $450 non-refundable application fee to collocate a facility on an existing structure. If the equipment is mounted on county-owned infrastructure, such as a traffic signal or streetlight, the provider must pay an annual recurring fee of $200 per location, or an amount equal to the county’s direct costs, whichever is greater.
The legislation mandates strict physical limitations to prevent visual clutter and right-of-way hazards. Antennas attached to existing structures cannot exceed ten feet above the tallest existing structure within 300 feet, or a maximum height of 45 feet above ground level. Furthermore, the total combined volume of all above-ground equipment (excluding the antenna, meters, and connection cables) is capped at 25 cubic feet.
To protect county assets, providers must submit a structural integrity analysis prepared by a licensed Illinois engineer ensuring the pole can handle wind and ice loads. Providers are completely financially responsible for any damage caused to county infrastructure during installation or maintenance and must provide a $20,000 performance bond to guarantee right-of-way restoration.
Violations of the chapter, including unauthorized installations or failure to remove abandoned equipment, will result in fines of $750 or twice the assessed application fee, whichever is greater, per day.
Latest News Stories
FBI probes Michigan synagogue attack as targeted violence, antisemitism
Iran to see ‘highest volume of strikes’ yet on Friday
Illinois Quick Hits: One confirmed dead from Kankakee tornado
Four service members killed in KC-135 crash
Will County Community Mental Health Board Faces $5 Million Shortfall in 2026 Grant Requests
Meeting Summary and Briefs: Public Health & Safety Committee for March 5, 2026
U.S. military jet goes down over Iraq; incident not attributed to hostile fire
WATCH: Dell Federal Symposium on AI improving work efficiency
NIH plots investments in women’s health
Pritzker: ‘God was looking out for people’ in storm-damaged Kankakee County
Illinois Quick Hits: Correctional officer charged with sexual misconduct
24 AGs question funding of orgs refusing to remove climate agenda from judges manuals