—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

Leave a Comment





Latest News Stories

Will County Board Land Use Committee Graphic.1

Will County Committee Denies Appeal for Crete Township ‘Tiny Home’ Permit

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: The Will County Land Use and Development Committee on Thursday upheld the denial of a temporary use...
Will County Board Land Use Committee Graphic.4

Will County Committee Grants Extensions for Crete, Washington Township Solar Projects

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: The Will County Land Use and Development Committee granted 180-day extensions for two commercial solar energy projects...
Screenshot 2025-11-05 at 4.02.49 PM

County Sales Tax Revenues Strong, Cannabis Funds Dispersed to Community Programs

Will County Finance Committee Meeting | November 2025 Article Summary: Will County's key sales tax revenues are on track to meet or exceed budget projections for fiscal year 2025, though...
solar panels photovoltaics in solar farm

New Lenox to Host Large Pollinator-Friendly Solar Farm

Will County Board Meeting | November 2025 Article Summary: The Will County Board unanimously approved a special use permit for a commercial solar energy facility spanning approximately 63 acres in...
joliet junior college logo

JJC Receives Clean Audit, Reports $21.6 Million Increase in Net Position

Joliet Junior College Meeting | November 12, 2025 Article Summary:Joliet Junior College received a "clean unmodified audit opinion" for the fiscal year ending June 30, 2025, the highest level of...
Will County P&Z Logo Planning Zoning

Committee Advances Special Use Permit for Used Car Dealership in New Lenox Township

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a special use permit for a light equipment sales...
Screenshot 2025-11-19 at 9.30.44 AM

Executive Committee Approves Appointments for Washington Township, Emergency Telephone Boards

Will County Board Executive Committee Meeting | November 13, 2025 Article Summary: The Will County Board Executive Committee on Thursday, November 13, 2025, recommended the approval of two key appointments, filling...
Screenshot 2025-11-19 at 9.30.06 AM

Frankfort, Will County Partner on Wildlife Rabies Control

Will County Board Executive Committee Meeting | November 13, 2025 Article Summary: The Will County Board Executive Committee recommended approval of an intergovernmental agreement on Thursday, November 13, 2025, that allows...
Screenshot 2025-11-19 at 9.30.24 AM

Will County Executive Committee to Hash Out Budget Cuts Following Levy Reduction

Will County Board Executive Committee Meeting | November 13, 2025 Article Summary: Following a Finance Committee vote to reduce the proposed 2026 property tax levy increase, Will County Board leaders on...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Executive Committee for November 13, 2025

Will County Board Executive Committee Meeting | November 13, 2025 The Will County Board’s Executive Committee met on Thursday, November 13, 2025, with its agenda dominated by a lengthy series...
Will County Board Land Use Committee Graphic.2

Committee Rejects Rezoning for Fencing Company in Joliet Township

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: Citing incompatibility with the surrounding residential neighborhood, the Will County Land Use and Development Committee unanimously denied...
Meeting Briefs

Meeting Summary and Briefs: Will County Land Use & Development Committee for November 6, 2025

Will County Land Use & Development Committee Meeting | November 6, 2025 The Will County Land Use and Development Committee navigated a series of contentious zoning cases on Thursday, November...
Will County Board Land Use Committee Graphic.2

Will County Committee Approves Rezoning, Denies Landfill Permit for Former Joliet Beach Club Site

Will County Land Use & Development Committee Meeting | November 6, 2025 Article Summary: The Will County Land Use and Development Committee on Thursday narrowly approved rezoning the former Joliet Beach...
Meeting Briefs

Meeting Summary and Briefs: Will County Finance Committee for November 2025

Will County Finance Committee Meeting | November 2025 The Will County Finance Committee reached an impasse over the 2025 tax levy during a heated meeting on Tuesday, prompting the postponement...
Will County Board Graphic.03

Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher

Will County Board Meeting | November 2025 Article Summary: The Will County Board approved a zoning map amendment and variances for a property in Beecher to bring existing unpermitted structures...