Will County Partners with LNS Development for Laraway Road Drainage Improvements in New Lenox
Will County Public Works & Transportation Committee Meeting | April 7, 2026
Article Summary: The county approved a cost-sharing agreement with a private developer to build shared stormwater management facilities that will serve both a new residential subdivision and the upcoming Laraway Road widening project.
Laraway Road / LNS Development Key Points:
-
Will County and LNS Development Group, LLC will co-fund shared stormwater infrastructure.
-
The county will pay an estimated $332,209.92 for its share of the detention facility and storm sewer upgrades.
-
The county is also paying LNS Development $19,862.03 to acquire 0.43 acres of right-of-way required for the Laraway Road widening project.
-
The Laraway Road project will widen the highway to four lanes between Cedar Road and Spencer Road.
Will County is leveraging private development to streamline its own infrastructure costs, approving an agreement with LNS Development Group, LLC on Tuesday, April 7, 2026, to construct shared stormwater facilities along Laraway Road in New Lenox.
The agreement centers on a parcel of land (PIN 15-08-35-100-011) where LNS Development is planning a new residential subdivision. Concurrently, Will County is engineering a major capacity project to widen Laraway Road (County Highway 74) from a two-lane road to a four-lane highway with a center barrier median from Cedar Road to Spencer Road.
Because both the county’s highway expansion and the private residential development require significant stormwater management, the two entities agreed to co-locate and share the costs of a detention facility and upgraded storm sewers on the developer’s parcel.
According to the engineer’s estimates provided in the agenda packet, Will County’s financial obligation for the construction of the shared improvements is capped at an estimated $332,209.92. This breaks down to $179,218.92 (21% of the total cost) for the detention basin, and $152,991.00 (100% of the required upgrades) to properly size the storm sewers to accommodate WCDOT drainage. LNS Development will cover the remaining construction costs.
Furthermore, the agreement secures the land Will County needs to physically widen the road. LNS Development will convey 0.43668 acres of right-of-way to the county in exchange for $19,862.03. In return, the county guarantees the developer’s vested rights to specific access points and drainage capacity along the newly widened highway.
The measure was passed unanimously and advances to the full County Board.
Latest News Stories
Illinois Quick Hits: Rockford sex abuse suspect arrested
Lawmakers concerned over taxpayer burden of Iran conflict
Pritzker pushes back on Megaproject tax concerns
Measles spreads across some Southwestern states
EXCLUSIVE: Inside one Michigan town’s fight against solar expansion
Trump demands unconditional surrender from Iran, mentions regime change
Illinois pols react to Homeland Security secretary’s exit, reassignment
Illinois quick hits: Appeals court vacates use of force injunction; Charges filed for possession of sex abuse materials; Gas prices keep rising
U.S. cut 92,000 jobs in ‘dismal’ February report, unemployment 4.4%
Board Splits Along Party Lines to Approve 2026 Federal Legislative Agenda
Turmoil in Texas: Concerns for Paxton to drop out, Gonzales drops reelection bid
HHS and DOC announce nutrition education initiative for medical schools