Artemis II heads to the moon with first crewed mission since 1972

Artemis II heads to the moon with first crewed mission since 1972

Spread the love

America is going back to the moon, after Artemis II lifted off from Cape Canaveral, Fla., Wednesday evening, more than five decades after Americans last set foot on the moon.

The lunar-bound spaceship lifted off shortly after 6:30 p.m. from the Kennedy Space Center, the first mission to the moon since 1972, when Apollo 17 spent over three days on the surface of the moon.

Artemis II is being manned by three American astronauts and one Canadian, commanded by Ret. U.S. Navy Capt. Reid Wiseman, piloted by U.S. Navy Capt. Victor Glover, along with mission specialists Christina Koch and Jeremy Hansen.

Artemis II marks some historical firsts for NASA. Koch will be the first woman astronaut to travel to the moon, while Hansen is set to be the first Canadian astronaut to make the trek.

The Artemis II mission will orbit the moon and is expected to last 10 days. The Orion spacecraft is expected to travel nearly 250,000 miles from Earth, the furthest a human has ever traveled from Earth.

The mission, which followed Artemis I, launched in 2022 as an unmanned lunar spaceflight — leading the way for other Artemis missions. Artemis I, II and III —eventually paving the way for Artemis IV in 2028, when humans are expected to set foot on the lunar surface.

The Artemis II mission is expected to pave the way for NASA to build a moon base, similar to the International Space Station. Ultimately, NASA plans to send humans to Mars.

Artemis II’s mission mirrors the Apollo 8 mission, launched in December 1968, paving the way for the Apollo 11 mission, which saw astronauts Neil Armstrong and Buzz Aldrin make history as the first humans to set foot on the moon.

At the time of the Apollo 8 mission, which orbited the moon on Christmas Eve 1968, it was considered the most dangerous mission NASA had undertaken to that date, with only a 50/50 chance of return. The mission proved an enormous success for the space program.

Over the past 45 years, the U.S. has focused its human space missions on orbiting Earth. Despite not launching a mission beyond Earth’s orbit in nearly 60 years, costs for the latest mission program have decreased.

The Apollo program cost American taxpayers $290 billion (inflation-adjusted) by the time of the first moon landing, Apollo 11, in 1969. NASA predicts the Artemis program will cost taxpayers $105 billion by the first landing, which is expected to launch by 2028.

The space capsule is expected to splash down off the coast of California.

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Summary and Briefs: Crete-Monee School Board for August 12, 2025

The Crete-Monee School District 201-U Board of Education confronted a challenging financial forecast and held a robust debate on arming a district security director during its August 12 meeting. The...
peotone library graphic logo.1

Peotone Library Director’s Salary Set at $75,000 After Annual Evaluation

Article Summary: The Peotone Public Library District Board of Trustees has set Library Director Sarah Ehlers' salary at $75,000 for the upcoming year. The decision was made in a special...
peotone library graphic logo.1

Peotone Library Director’s Salary Set at $75,000 After Annual Evaluation

Article Summary: The Peotone Public Library District Board of Trustees has set Library Director Sarah Ehlers' salary at $75,000 for the upcoming year. The decision was made in a special...
Screenshot 2025-11-26 at 7.32.09 AM

Village Hall to Get $412,000 Fire Sprinkler Replacement After System Failure

Village of Monee Board Meeting | August 13, 2025 Article Summary: Following the failure of the original 1997 fire sprinkler system due to corrosion, the Monee Village Board approved a...
crete-monee school district graphic.6

Crete-Monee Board Adopts School Improvement Plans for 2025-2026

Article Summary: The Crete-Monee Board of Education has approved the 2025-2026 School Improvement Plans (SIPs) for all eight schools in the district. The plans, which are a federal requirement for...
Exec Cmte 8.14.25.3

Executive Committee Considers $12,000 Strategic Planning Initiative with University of St. Francis

Article Summary: The Will County Executive Committee is considering a proposal from the University of St. Francis to lead a six-month, $12,178 strategic planning process. The initiative is aimed at...
crete-monee school district graphic.5

Board Approves Over $4.4 Million for Major Construction Projects

Article Summary: The Crete-Monee School Board authorized payments totaling over $4.4 million for significant construction and renovation work at Crete-Monee High School and Crete Elementary School. The payments cover ongoing...
Exec Cmte 8.14.25.2

Executive Committee Members Decry Roadside Litter, Call for Action Against Garbage Haulers

Article Summary: Will County Executive Committee members expressed frustration over what they described as a worsening problem of litter blowing from garbage trucks across the county. Members called for better...
crete-monee school district graphic.4

District Presses Village of Monee on TIF Expiration, Moves to Sell School Property

Article Summary: Crete-Monee officials are urging the Village of Monee to finalize the expiration of a key tax increment financing (TIF) district before a November deadline to ensure the school...
Ad Hoc.8.12.25.3

Will County Updates Solid Waste Ordinance, Increases Fines and Reporting to Landfill Committee

Article Summary: The Will County Ad-Hoc Ordinance Review Committee advanced an updated solid waste ordinance that doubles the maximum fine for violations and requires the county auditor's annual report to...
Ad Hoc.8.12.25.2

Citing Liability Concerns, Will County Committee Postpones Vote on Septic System Ordinance

Article Summary: The Will County Ad-Hoc Ordinance Review Committee postponed a vote on updating its sewer and sewage disposal ordinance after a member raised significant concerns about the county's liability...
Ad Hoc.8.12.25.1

Will County Moves to Repeal Obsolete 1972 Fire Hydrant Ordinance

Article Summary: An ordinance from 1972 regulating the placement and specifications of fire hydrants in Will County is set to be repealed after the Ad-Hoc Ordinance Review Committee approved its...
Committee of teh Whole 8.12.25

Will County Board Gets Back to Basics with Robert’s Rules of Order Training

Article Summary: The Will County Board Committee of the Whole received a detailed training session on Robert's Rules of Order from parliamentary expert Matthew Prochaska to clarify procedures for conducting...
Exec Cmte 8.14.25.1

Executive Committee Approves Amended Houbolt Bridge Agreement to Settle Litigation

Article Summary: The Will County Executive Committee has approved an amendment to the Houbolt Road Toll Bridge agreement, formalizing a settlement between the bridge operators and the City of Joliet....
Meeting Briefs

Meeting Summary and Briefs: Will County Board Committee of the Whole for August 12, 2025

The Will County Board’s Committee of the Whole dedicated its August 12 meeting to an in-depth training session on Robert’s Rules of Order, aiming to foster more efficient and orderly...