County Approves $1.9 Million for Wilmington-Peotone Road Engineering
Will County Board Meeting | February 19, 2026
Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements to Wilmington-Peotone Road.
Wilmington-Peotone Road Key Points:
-
Project Limit: Wilmington-Peotone Road (CH 25) from U.S. Route 45/52 to Center Road (CH 19).
-
Cost: $1,989,737.00.
-
Funding Source: County Motor Fuel Tax (MFT) allotment.
-
Contractor: Alfred Benesch and Company (Chicago).
The Will County Board took a significant step toward upgrading a key corridor in District 2 on Thursday, approving a $1.98 million expenditure for design engineering on Wilmington-Peotone Road.
The resolution allocates $1,989,737 in Motor Fuel Tax (MFT) funds to cover Phase I engineering services for the stretch of road between U.S. Route 45/52 and Center Road.
The board awarded the contract for these design services to Alfred Benesch and Company. Phase I engineering typically involves environmental studies, preliminary design, and determining the scope of necessary improvements before construction plans are finalized.
This project is part of the county’s broader Transportation Improvement Program. According to the county’s 2026 Federal Legislative Agenda, which was also discussed during the meeting, the Will County Division of Transportation is performing a Planning and Environmental Linkages (PEL) study on approximately 22 miles of the Wilmington-Peotone corridor to address “new freight clusters” that have appeared in the area.
The expenditure was passed as part of the public works consent agenda.
Latest News Stories
States, caregivers can now view key metrics for state child welfare systems
More Illinois Catholic schools close; candidates call for change
U.S. effort to limit China’s influence reaches Latin America
Govt. shutdown risk spikes as Senate Democrats vow to tank funding package
Report: EU regulations cost billions for American tech companies
Acting ICE director ordered to court by Minnesota federal judge
Crackdown in Minneapolis underway following Trump talks with Walz, Frey
WATCH: Chicago IG seeks urgency on OT costs; Group warns taxpayers paying for polls
Illinois Quick Hits: Grants issued for apprenticeship programs
K-12 schools, higher ed institutions prevail in diversity litigation
Medical group debunks recent study on racial concordance, says patient outcomes not improved by philosophy
County Approves $22 Million in Road Projects for Lorenzo Road and Mills Road