solar panels photovoltaics in solar farm

New Lenox to Host Large Pollinator-Friendly Solar Farm

Spread the love

Will County Board Meeting | November 2025

Article Summary: The Will County Board unanimously approved a special use permit for a commercial solar energy facility spanning approximately 63 acres in New Lenox Township. The project, located on South Spencer Road, will feature over 12,000 solar panels and includes plans for native pollinator vegetation.

Spencer Road Solar Key Points:

  • Location: A 110-acre parcel on South Spencer Road, south of 1100 S. Spencer Road, New Lenox. The solar facility will occupy ~63 acres.

  • Scale: Two facilities (2.4 MW and 2.85 MW) comprising 12,029 solar panels on single-axis trackers.

  • Pollinator Focus: The board granted variances for plant height (up to 36 inches) and mowing frequency (once per year) to allow for deep-rooted native pollinator plants.

  • Community Impact: The Village of New Lenox did not object to the project, subject to screening conditions which were included in the approval.

NEW LENOX – A significant new solar energy development is coming to New Lenox Township following a unanimous 22-0 vote by the Will County Board on Thursday.

The project, developed by Nexamp Solar under the names “Spencer Road Solar East” and “Spencer Road Solar West,” will transform agricultural land into a solar farm capable of generating over 5 megawatts of power.

A key feature of this development is its designation as a “pollinator-friendly” site. To support this, the Board approved two specific variances: allowing ground cover plants to grow up to 36 inches (ordinance limit is 13 inches) and reducing the required mowing frequency to once per year.

“Native pollinators are typically plants that have deep root systems that recharge the agricultural soils… and are natural weed prevention,” County Land Use staff noted in their report.

While three objectors raised concerns about wildlife disruption and aesthetics during the public hearing process, the project received a letter of non-objection from the Village of New Lenox, provided that landscape screening is installed along the western fence line. The project will also feature an 8-foot “fixed knot” farm fence rather than chain link, a requirement intended to be more wildlife-friendly.

The Forest Preserve District of Will County also weighed in, encouraging the developer to select native species that support the local ecosystem. The project is expected to bring 20 to 25 construction jobs to the area.

Monee Events

10 Dec

Village Board Meeting

December 10, 2025
6:30 pm - 11:59 pm
https://villageofmonee.org/calendar.aspx?EID=1537

Leave a Comment





Latest News Stories

Screenshot 2025-10-10 at 11.52.24 AM

Will County Considers Moving Land Use Public Hearings Away from Full Board Meetings

Will County Executive Committee Meeting October 9, 2025 Article Summary: A proposal to move the final public hearing for zoning and land use cases from the full Will County Board...
Meeting Briefs

Meeting Summary and Briefs: Village of Monee Board for September 24, 2025

Village of Monee Board Meeting | September 24, 2025 Meeting Summary: The Monee Village Board of Trustees met on Tuesday, September 24, 2025, handling a mix of long-term planning and...
Screenshot 2025-11-26 at 7.56.09 AM

Public Works Facility and Firemen’s Park Set for Grand Openings

Village of Monee Board Meeting | September 24, 2025 Article Summary: Monee officials announced upcoming grand opening celebrations for two major capital projects: the new Public Works facility and the...
WCO 2025-09-27 at 9.04.36 AM

Meeting Summary and Briefs: Will County Board for September 18, 2025

The Will County Board navigated a contentious meeting on September 18, 2025, marked by narrow votes on two highly debated land use issues in Crete and Homer Glen. The board...
Screenshot 2025-11-26 at 7.55.56 AM

Monee Approves 5-Year Police Contract with Retroactive Pay

Village of Monee Board Meeting | September 24, 2025 Article Summary: The Monee Village Board unanimously approved a new collective bargaining agreement with Teamsters Local Union #700, representing village police...
WCO 2025-09-27 at 9.05.04 AM

County Board Abates Over $25 Million in Property Taxes for Bond Payments

Article Summary: Will County property taxpayers will be spared over $25 million in taxes for the 2026 payment year after the County Board voted to abate taxes for six separate...
Screenshot 2025-11-26 at 7.54.57 AM

Trucking Facility Proposal Sparks Debate Over Pavement and De-Annexation

Village of Monee Board Meeting | September 24, 2025 Article Summary: The Monee Village Board reviewed a preliminary annexation agreement for a 56-acre industrial development across from Amazon, which includes...
Meeting Briefs

Meeting Summary and Briefs: Monee Township Board for Aug. 2025

Monee Township Board Meeting | August 2025 The Monee Township Board met on Thursday, August 21, 2025, to handle monthly administrative business and plan for upcoming fall community events. Supervisor...
WCO 2025-09-27 at 9.04.56 AM

Will County Reverses Zoning on Peotone Farmland to Facilitate 10-Acre Sale

Article Summary: The Will County Board unanimously approved a request to rezone a 10.08-acre portion of a property in Will Township back to agricultural use, reversing a 2023 zoning change....
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
Monee Township Graphic.3

Attorney Advises Board Against Reissuing 18-Year-Old Check

Monee Township Board Meeting | August 2025 Article Summary: The Monee Township Board discussed a request to reimburse a vendor for an uncashed check dating back to 2007. The Township Attorney...