Engineering Firm Hired for Gougar Road Bridge Replacement
Will County Board Meeting | November 2025
Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian National Railroad in New Lenox. The project aims to improve safety and traffic flow at a critical infrastructure point.
Gougar Road Bridge Key Points:
-
Project: Phase II Design Engineering for the Gougar Road Bridge (County Highway 52).
-
Location: Gougar Road over the Canadian National (CN) Railroad tracks in New Lenox Township.
-
Cost: $301,703.00.
-
Contractor: A. Epstein and Sons International, Inc.
-
Scope: The firm will design a new structure and roadway approaches to replace the existing infrastructure.
JOLIET – Will County is moving forward with plans to replace the Gougar Road bridge over the Canadian National Railroad in New Lenox, authorizing a significant engineering contract on Thursday.
The Board approved a supplemental professional services agreement with A. Epstein and Sons International, Inc. valued at $301,703. The firm is tasked with “Phase II” design engineering, which involves creating the final contract plans, easement documents, and right-of-way plats necessary for construction.
The project targets a section of Gougar Road (County Highway 52) that serves as a key artery in District 2. The current structure over the CN tracks has been identified for replacement to meet modern traffic and safety standards.
Funding for the engineering work will come from a combination of sources, potentially including the Illinois Commerce Commission Grade Crossing Protection Fund, County RTA Tax funds, and County Motor Fuel Tax funds.
This design phase is a critical precursor to construction. Once A. Epstein and Sons completes the structural and roadway design, the county will be positioned to bid the project for construction, likely in a future fiscal year.
Latest News Stories
States, caregivers can now view key metrics for state child welfare systems
More Illinois Catholic schools close; candidates call for change
U.S. effort to limit China’s influence reaches Latin America
Govt. shutdown risk spikes as Senate Democrats vow to tank funding package
Report: EU regulations cost billions for American tech companies
Acting ICE director ordered to court by Minnesota federal judge
Crackdown in Minneapolis underway following Trump talks with Walz, Frey
WATCH: Chicago IG seeks urgency on OT costs; Group warns taxpayers paying for polls
Illinois Quick Hits: Grants issued for apprenticeship programs
K-12 schools, higher ed institutions prevail in diversity litigation
Medical group debunks recent study on racial concordance, says patient outcomes not improved by philosophy
County Approves $22 Million in Road Projects for Lorenzo Road and Mills Road