Will County P&Z Logo Planning Zoning.2

Commission Approves Massive Lake Michigan Water Infrastructure Project for Troy Township

Spread the love

Will County Planning and Zoning Commission Meeting | May 5, 2026

Article Summary: The Will County Planning and Zoning Commission on May 5, 2026, unanimously approved two major public utility requests and associated fence variances to facilitate the construction of regional water storage and pumping facilities. The 40-acre development at Black Road and County Line Road is a critical component of a $1.446 billion initiative to deliver Lake Michigan water to six Will County municipalities by 2030.

Water Infrastructure Key Points:

  • Project Scope: The development includes a 1.5 million-gallon “spheroid” elevated storage tank standing 145 feet tall, a pump station, and a public works garage.

  • Dual Ownership: The site is divided into two 20-acre parcels—one owned by the Grand Prairie Water Commission (ZC-26-019) and one by the City of Joliet (ZC-26-018).

  • Regional Impact: The facilities will serve 250,000 residents across Joliet, Shorewood, Crest Hill, Channahon, Minooka, and Romeoville.

  • Security Measures: Both parcels were granted variances to install 8-foot-tall security fences (7-foot chain link with 1 foot of barbed wire), exceeding the standard 7-foot limit for the A-1 district.

JOLIET — A massive regional effort to secure a sustainable water supply for Will County took a significant step forward Tuesday, May 5, 2026, as the Planning and Zoning Commission cleared the way for the Grand Prairie Water Commission (GPWC) and the City of Joliet to begin developing a critical infrastructure hub in Troy Township.

The two related cases, ZC-26-018 and ZC-26-019, involve adjacent vacant properties located at the southeast corner of Black Road and County Line Road. The project is born of necessity; Allison Swisher, Director of Public Utilities for Joliet, testified that the region’s existing deep aquifer is failing and will be unable to meet maximum demand by 2030.

“We selectioned purchasing water from the City of Chicago as the most sustainable and reliable option,” Swisher told the commission. “The majority of this project will serve Will County residents.”

Site Specifics and Security
The GPWC parcel (ZC-26-019) will house the project’s second intermediate storage facility, featuring a 1.5 million-gallon steel tank. The City of Joliet’s neighboring parcel (ZC-26-018) will include additional water storage tanks, a public works garage, and an outdoor storage yard.

Because of the “critical” nature of the water supply, the applicants requested variances to allow for 8-foot-tall fencing topped with barbed wire for security. Staff recommended approval, noting that while the area remains primarily agricultural, it is slated for future residential growth that requires this infrastructure.

Commissioner John Kiefner questioned why the properties were not being annexed into Joliet. Swisher responded that while annexation is likely in the future, the commission needs to begin construction immediately to meet the 2030 deadline for water delivery.

The commission approved the Special Use Permits and the fence variances for both parcels without a single dissenting vote.

Leave a Comment





Latest News Stories

Screenshot 2025-10-10 at 11.20.27 AM

Sheriff’s Office Reports Crime Down 10%, Cites Body Cam Footage as Main Challenge of Safety Act

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: The Will County Sheriff's Office reported a nearly 10% overall drop in crime compared to the same...
Screenshot 2025-10-10 at 11.52.24 AM

Will County Considers Moving Land Use Public Hearings Away from Full Board Meetings

Will County Executive Committee Meeting October 9, 2025 Article Summary: A proposal to move the final public hearing for zoning and land use cases from the full Will County Board...
Meeting Briefs

Meeting Summary and Briefs: Village of Monee Board for September 24, 2025

Village of Monee Board Meeting | September 24, 2025 Meeting Summary: The Monee Village Board of Trustees met on Tuesday, September 24, 2025, handling a mix of long-term planning and...
Screenshot 2025-11-26 at 7.56.09 AM

Public Works Facility and Firemen’s Park Set for Grand Openings

Village of Monee Board Meeting | September 24, 2025 Article Summary: Monee officials announced upcoming grand opening celebrations for two major capital projects: the new Public Works facility and the...
WCO 2025-09-27 at 9.04.36 AM

Meeting Summary and Briefs: Will County Board for September 18, 2025

The Will County Board navigated a contentious meeting on September 18, 2025, marked by narrow votes on two highly debated land use issues in Crete and Homer Glen. The board...
Screenshot 2025-11-26 at 7.55.56 AM

Monee Approves 5-Year Police Contract with Retroactive Pay

Village of Monee Board Meeting | September 24, 2025 Article Summary: The Monee Village Board unanimously approved a new collective bargaining agreement with Teamsters Local Union #700, representing village police...
WCO 2025-09-27 at 9.05.04 AM

County Board Abates Over $25 Million in Property Taxes for Bond Payments

Article Summary: Will County property taxpayers will be spared over $25 million in taxes for the 2026 payment year after the County Board voted to abate taxes for six separate...
Screenshot 2025-11-26 at 7.54.57 AM

Trucking Facility Proposal Sparks Debate Over Pavement and De-Annexation

Village of Monee Board Meeting | September 24, 2025 Article Summary: The Monee Village Board reviewed a preliminary annexation agreement for a 56-acre industrial development across from Amazon, which includes...
Meeting Briefs

Meeting Summary and Briefs: Monee Township Board for Aug. 2025

Monee Township Board Meeting | August 2025 The Monee Township Board met on Thursday, August 21, 2025, to handle monthly administrative business and plan for upcoming fall community events. Supervisor...
WCO 2025-09-27 at 9.04.56 AM

Will County Reverses Zoning on Peotone Farmland to Facilitate 10-Acre Sale

Article Summary: The Will County Board unanimously approved a request to rezone a 10.08-acre portion of a property in Will Township back to agricultural use, reversing a 2023 zoning change....
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...