Monee Graphic.1

Monee Approves $39,114 Purchase of John Deere Gator for Winter Sidewalk Maintenance

Spread the love

Monee Village Board of Trustees Meeting | March 11, 2026

Article Summary: To keep pace with the village’s expanding pedestrian network, the Monee Village Board approved the purchase of a heated John Deere utility vehicle equipped with a snow plow and salt spreader.

DPW Equipment Purchase Key Points:

  • The board unanimously approved $39,114.78 for a 2026 John Deere Gator 845M HVAC and related winter attachments.

  • The new equipment will allow Public Works to clear 8-foot-wide walking paths significantly faster than the current lawnmower-based setup.

  • The purchase utilizes the State of Illinois Government Pricing Program for cooperative cost savings and is funded through the FY2026 budget.

MONEE, Ill. — The Monee Village Board of Trustees on Wednesday, March 11, 2026, voted unanimously to upgrade the Department of Public Works’ (DPW) snow removal fleet, approving the purchase of a fully equipped 2026 John Deere Gator 845M HVAC.

The total cost of the purchase is $39,114.78, utilizing a cooperative purchasing contract through Shorewood Home and Auto. According to the agenda packet, the base vehicle costs $28,852.78. The village also approved two attachments: a SnowEx 6.0 cubic foot stainless steel drop spreader for $4,856.00 and a SnowEx 6-foot UTV V-Plow for $5,406.00.

Village Administrator Ruben Bautista told the board the purchase has become essential due to the village’s new sidewalk construction program, which is rapidly expanding the local pedestrian network. The utility vehicle will specifically target the growing sidewalk system and the newly constructed Firemen’s Park complex.

Public Works Superintendent Ed Johnson provided the board with a practical explanation of why the equipment is necessary to maintain the village’s 8-foot-wide walking paths, such as those on Industrial Drive and the future Bailey Lane paths.

“Our current method for clearing those areas is a lawn mower with a snowthrower attachment that moves at about four miles an hour,” Johnson explained. “A Gator with a six-foot blade and a salt spreader will be able to access those areas and a lot more efficiently be able to maintain those areas.”

Johnson confirmed the vehicle features a heated cab, ensuring operator safety and comfort during the winter months. The funding for the equipment was already included and approved within the FY2026 budget.

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Summary and Briefs: Monee Village Board for July 23, 2025

The Monee Village Board of Trustees heard a detailed presentation for a major industrial redevelopment, approved a significant payment for its nearly-completed public works facility, and gave final clearance for...
Meeting Briefs

Meeting Summary: Peotone School District 207-U for July 21, 2025

District Weighs Budget Cuts vs. More Debt: Peotone schools must create a state-mandated deficit reduction plan to address a recurring ~$2 million operating shortfall. The Board of Education is debating whether...
Peotone-School-Cmte-Of-Whole-July-21.4

Summer Construction Projects Transforming Peotone Schools

Major construction projects are progressing on schedule across Peotone School District 207-U, with significant HVAC upgrades, new secure entrances, and extensive paving work transforming campuses ahead of the new school...
Meeting Briefs

Meeting Summary and Briefs: Monee Township Board for June 19, 2025

Monee Township Board Meeting | June 19, 2025 The Monee Township Board met on Thursday, June 19, 2025, to handle monthly business, including the approval of building maintenance contracts and...
Peotone-School-Cmte-Of-Whole-July-21.2

Peotone Schools to Launch “Go Big Blue” Unity Initiative

Peotone School District 207-U will rally under a new theme, “Go Big Blue,” for the 2025-26 school year in a comprehensive initiative aimed at unifying the district around common character...
Peotone-School-Cmte-Of-Whole-July-21.2

Peotone FFA Alumni Propose Privately Funded Greenhouse to Expand Program

The Peotone High School agriculture program could see a major expansion after the Peotone FFA Alumni and Friends group presented a proposal to the Board of Education to privately fund...
peotone library graphic logo.2

Peotone Library Faces ‘Enormous’ Cost for Major Plumbing Replacement

Article Summary: The Peotone Public Library District is facing a significant and unexpected expense after a construction consultant recommended a full replacement of a cast iron plumbing pipe. Library Director...
peotone library graphic logo.4

Peotone Library Faces ‘Enormous’ Cost for Major Plumbing Replacement

Article Summary: The Peotone Public Library District is facing a significant and unexpected expense after a construction consultant recommended a full replacement of a cast iron plumbing pipe. Library Director...
peotone library graphic logo.1

Peotone Library District to Explore Potential Expansion into Monee

Article Summary: The Peotone Public Library District is officially considering an expansion of its physical services after the Board of Trustees agreed to form a committee to study the possibility...
peotone library graphic logo.1

Peotone Library District to Explore Potential Expansion into Monee

Article Summary: The Peotone Public Library District is officially considering an expansion of its physical services after the Board of Trustees agreed to form a committee to study the possibility...
peotone library graphic logo.4

Library Board Adopts New Spending and Conduct Policies

Article Summary: The Peotone Public Library Board of Trustees approved two key governance documents, an "Authority to Spend" policy and a "Board Code of Conduct," to clarify financial procedures and...
peotone library graphic logo.4

Library Board Adopts New Spending and Conduct Policies

Article Summary: The Peotone Public Library Board of Trustees approved two key governance documents, an "Authority to Spend" policy and a "Board Code of Conduct," to clarify financial procedures and...
Meeting Briefs

Meeting Summary and Briefs: Peotone Public Library District Board for June 17, 2025

The Peotone Public Library District Board of Trustees tackled significant issues at its June meeting, highlighted by news of a potentially "enormous" cost to repair major plumbing infrastructure in the...
Meeting Briefs

Meeting Summary and Briefs: Peotone Public Library District Board for June 17, 2025

The Peotone Public Library District Board of Trustees tackled significant issues at its June meeting, highlighted by news of a potentially "enormous" cost to repair major plumbing infrastructure in the...
Peotone-School-Cmte-Of-Whole-July-21.3

Peotone Schools Face Mandatory Deficit Plan, Weighs Cuts Against More Debt

Peotone School District 207-U is facing a state-mandated deficit reduction plan as its tentative fiscal year 2026 budget projects a nearly $2 million annual operating shortfall, a recurring issue that...