County Approves $1.9 Million for Wilmington-Peotone Road Engineering
Will County Board Meeting | February 19, 2026
Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements to Wilmington-Peotone Road.
Wilmington-Peotone Road Key Points:
-
Project Limit: Wilmington-Peotone Road (CH 25) from U.S. Route 45/52 to Center Road (CH 19).
-
Cost: $1,989,737.00.
-
Funding Source: County Motor Fuel Tax (MFT) allotment.
-
Contractor: Alfred Benesch and Company (Chicago).
The Will County Board took a significant step toward upgrading a key corridor in District 2 on Thursday, approving a $1.98 million expenditure for design engineering on Wilmington-Peotone Road.
The resolution allocates $1,989,737 in Motor Fuel Tax (MFT) funds to cover Phase I engineering services for the stretch of road between U.S. Route 45/52 and Center Road.
The board awarded the contract for these design services to Alfred Benesch and Company. Phase I engineering typically involves environmental studies, preliminary design, and determining the scope of necessary improvements before construction plans are finalized.
This project is part of the county’s broader Transportation Improvement Program. According to the county’s 2026 Federal Legislative Agenda, which was also discussed during the meeting, the Will County Division of Transportation is performing a Planning and Environmental Linkages (PEL) study on approximately 22 miles of the Wilmington-Peotone corridor to address “new freight clusters” that have appeared in the area.
The expenditure was passed as part of the public works consent agenda.
Latest News Stories
Trump’s ACA tax credit extension proposal delayed after GOP pushback
EXCLUSIVE: Texas rep calls on Trump to get Texan released from Mexican prison
Illinois tops U.S. in pumpkin production despite recent decline in value
Congress moves to restore federal union powers, critics warn of higher costs
Energy org asks DHS to deny Thunberg entry to country due to disruptive behavior
Ukraine agrees to preliminary peace plan; Russian strikes continue
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation
Trump administration ends protected status for Burmese nationals
Trump designates Muslim Brotherhood as foreign terrorist organization
Tractor Supply Construction on Track for February Opening
Township Board Approves $5,000 Grant for Mud Dog Baseball
Talala Elementary Designated “Comprehensive” as District Reviews Academic Performance