Committee-Executive.Graphic

Executive Committee Advances $28.7 Million BNSF Bridge Project for Lorenzo Road

Spread the love

Will County Executive Committee Meeting | February 11, 2026

Article Summary: The Executive Committee approved an agreement with BNSF Railway to construct a grade separation bridge on Lorenzo Road in Wilmington. The railroad will contribute over $15 million toward the project and provide a one-time maintenance payment to the county.

Lorenzo Road Bridge Key Points:

  • Project: Construction of a grade separation bridge carrying Lorenzo Road (CH 80) over the BNSF Railroad tracks.

  • Location: 1.25 miles west of I-55 in County Board District 1.

  • Total Cost: The estimated total project cost is $28,717,523.80.

  • Railroad Contribution: BNSF will reimburse the county 100% of costs after the execution of ICC funds, up to a cap of $15,102,943.80.

  • Maintenance Fee: BNSF will pay Will County a one-time maintenance fee of $675,003.28 for the useful life of the overpass.

The Will County Board Executive Committee on Wednesday, February 11, 2026, approved Resolution 26-046, authorizing an agreement between the County and BNSF Railway for a major infrastructure project on Lorenzo Road.

The project involves constructing a bridge to separate the grade of Lorenzo Road (County Highway 80) from the BNSF rail line, located approximately 1.25 miles west of Interstate 55. The project aims to eliminate the at-grade crossing, improving safety and traffic flow in the heavy industrial corridor.

According to the agreement attached to the agenda, the total estimated cost of construction is $28,717,523.80. Under the terms of the deal, BNSF Railway will contribute significantly to the project. Once $12 million in Illinois Commerce Commission (ICC) funds are executed, BNSF will reimburse the county for remaining costs up to a cap of $15,102,943.80.

Additionally, the agreement stipulates that BNSF will provide a one-time lump sum payment of $675,003.28 to the county to cover future maintenance costs for the structure over its useful life. The county will be responsible for maintaining the roadway, bridge structure, and drainage.

The agreement requires the contractor to maintain strict safety clearances during construction, including 25 feet horizontally from the track centerline.

The measure was moved by Member Jacqueline Traynere and seconded by Member Denise Winfrey. It passed unanimously.

Monee Weather Full forecast →
Today Jun 8
Slight Chance Rain Showers then Slight Chance Showers And Thunderstorms
85° 71°

Slight Chance Rain Showers then Slight Chance Showers And Thunderstorms

💨 5 to 10 mph 💧 20%

Leave a Comment





Latest News Stories

fall-festival-b2adf834-992f-4ebd-ac09-edfc1d11b40a-circle

Your Ultimate Guide to the 2025 Frankfort Fall Fest: Everything to Know for the Nationally-Ranked Event

FRANKFORT, IL – The heart of historic downtown Frankfort is set to transform into a vibrant hub of art, music, and community spirit for the 57th annual Frankfort Fall Festival. Running...
Meeting-Briefs

Meeting Summary and Briefs: Monee Township Board for July 2025

Monee Township Board Meeting | July 2025 The Monee Township Board met on Thursday, July 17, 2025, to conduct monthly business, including the approval of financial reports and discussion of...
Meeting Briefs

Meeting Summary and Briefs: Village of Monee Board for August 13, 2025

Village of Monee Board Meeting | August 13, 2025 Meeting Summary: The Monee Village Board of Trustees met on Wednesday, August 13, 2025, for a session dominated by significant infrastructure...
Monee Township Logo.1

Clerk Reports Single Bid of $635,000 for Road Improvements

Monee Township Board Meeting | July 2025 Article Summary: Township Clerk Bobby Lathan reported that a recent bid opening for road improvements yielded only one proposal. The lone bid from Iroquois...
Screenshot 2025-11-26 at 7.32.32 AM

Board Advances Development Plans for Industrial Drive

Village of Monee Board Meeting | August 13, 2025 Article Summary: The Monee Village Board authorized legal and administrative staff to begin negotiating a redevelopment agreement with LS Realty, Inc....
WCO Board Aug 21.4

After Initial Rejection and Tense Debate, Board Reconsiders and Approves Contested DuPage Township Business

Article Summary: In a rare reversal, the Will County Board approved a special use permit for a landscaping business in a residential area of DuPage Township after the measure initially...
Meeting Briefs

Meeting Summary and Briefs: Will County Board for August 21, 2025

The Will County Board received County Executive Jennifer Bertino-Tarrant’s proposed $791 million budget for fiscal year 2026, which holds the line on the property tax levy while funding key services....
Will County Recorder Graphic.1

Will County Board Approves New Fee Schedule for Recorder of Deeds

Article Summary: The Will County Board has approved a revised fee schedule for the Recorder of Deeds office, which will take effect on October 1, 2025. The changes, based on...
WCO Board Aug 21.3

Will County Board Formally Opposes Heavier, Longer Trucks on National Roadways

Article Summary: The Will County Board unanimously passed a resolution opposing any federal legislation that would increase the size and weight limits for commercial trucks on the nation's roadways. The...
will county board meeting graphic.5

Will County Board Approves Permits for Landscaping Business and Restaurant Liquor Service in Frankfort Area

Article SummaryThe Will County Board unanimously approved three separate special use permits for businesses in the Frankfort area, allowing a landscaping operation in Green Garden Township to continue and two...
will county board meeting graphic.5

Board Approves Engineering Contracts for Mokena Road Widening

Article SummaryThe Will County Board approved over $1.1 million in supplemental engineering contracts to advance the ongoing 80th Avenue improvement project in Mokena. The additional funding addresses project delays and...
will county board meeting.6

Will County Awards $1.46 Million Contract for Kankakee Street Bridge Replacement in Manhattan Township

Article SummaryThe Will County Board has awarded a $1.46 million contract to "D" Construction, Inc. of Coal City to replace the Kankakee Street Bridge over Jackson Creek in Manhattan Township....
will county board meeting.6

Crete Township Community Center to Get New Digital Sign

Article Summary: The Will County Board approved a special use permit and two variances for Crete Township, allowing for the installation of a new on-premise dynamic display sign at its...
WCO Board Aug 21.1

Will County Executive Proposes $791 Million Budget Focused on Stability Amidst Economic Uncertainty

Article Summary: Will County Executive Jennifer Bertino-Tarrant presented a balanced $791 million budget proposal for Fiscal Year 2026 that aims to maintain services and prepare for potential economic challenges without...
Planning & Zoning Graphic.3

Will County P&Z: Washington Township Lot Variance Granted

A variance to reduce the minimum lot area from 10 acres to 5 acres was unanimously approved for a property at 1444 E. Corning Road in Washington Township. The owner,...