Traffic Alert: Wolf Road water repairs rescheduled for Tuesday
MOKENA – Drivers traveling through Mokena should prepare for delays on Wolf Road tomorrow, as village officials have rescheduled planned water system repairs.
The Village of Mokena announced that the infrastructure work, originally slated for Monday, has been moved to Tuesday, Feb. 3. Crews will be performing repairs on the west side of Wolf Road, specifically along the stretch between Platner Drive and the Hickory Creek Bridge.
Work is scheduled to begin at approximately 9:00 a.m. and is expected to be completed by the end of the day.
During the repair operations, one lane of traffic will be temporarily closed in the area. While traffic flow will be maintained in both directions, officials warn that drivers should expect congestion.
The Village encourages motorists to utilize alternate routes if possible. Those who must travel through the work zone are advised to exercise increased caution to ensure the safety of the construction crews.
Latest News Stories
Trump’s ACA tax credit extension proposal delayed after GOP pushback
EXCLUSIVE: Texas rep calls on Trump to get Texan released from Mexican prison
Illinois tops U.S. in pumpkin production despite recent decline in value
Congress moves to restore federal union powers, critics warn of higher costs
Energy org asks DHS to deny Thunberg entry to country due to disruptive behavior
Ukraine agrees to preliminary peace plan; Russian strikes continue
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation
Trump administration ends protected status for Burmese nationals
Trump designates Muslim Brotherhood as foreign terrorist organization
Tractor Supply Construction on Track for February Opening
Township Board Approves $5,000 Grant for Mud Dog Baseball
Talala Elementary Designated “Comprehensive” as District Reviews Academic Performance